PrePack Wells

 

We are pleased to announce that ZEBRA Environmental is now installing 2” ID Prepacks.
With the increase in strength of our fleet of Geoprobe series 7700 & 6600’s coupled with the availability of larger diamter casing placing the 2” ID Prepack monitoring and injection wells is a viable alternative to conventional drilling. Here is why more ground water professionals are using Prepack Wells?

Well Screens designed for setting Small Diameter Monitoring Wells. Pre-pack well screens are available in two outside diameters� 35 mm OD (12 or 20 mm ID) and 62 mm OD (25 or 37 mm ID).

To install a monitoring well with these pre-packs, probe rods are first driven to depth with a Geoprobe percussion probing machine. The well assembly is then lowered into the probe rod string with threaded PVC riser pipe. The small diameter pre-pack well screen assembly uses 12 mm PVC riser pipe and is installed with 2.125-inch OD probe rods. The larger diameter pre-pack well assembly uses 25 mm PVC riser pipe and is installed with 3.25-inch OD probe rods. Once the well assembly is lowered to the bottom of the probe rod string, the probe rods are retracted to a point above the screen. A sand barrier, installed directly above the well screen, prevents grout from entering the screens.


This barrier can be created either by natural formation collapse (occurring during the initial probe rod retraction) or by gravity installation of fine-grade sand through the rod annulus. With the barrier in place, granular bentonite or bentonite slurry is then installed in the annulus to form a well seal.

Advantages

♦ The most cost effective method for installing permanent monitoring wells.
♦ Available in sizes ranging from 0.5-inch through 2-inch I.D.
♦ Manufactured using PVC and high quality stainless steel screens to assure high integrity samples.
♦ Assures accurate placement of filter media across desired interval.
♦ Quick Seal and Bentonite sleeves protects the sampling environment.
♦ Installed through cased borehole, provides high integrity well construction and sample quality.
♦ Meets ASTM standard D6725 for Direct Push Monitoring Well Installation.
♦ Meets basic EPA and RCRA construction requirements.
♦ DOD and EPA Studies reveal no statistically significant difference between water quality samples collected from paired Pre-Packs and conventional drilled wells.

 

ZEBRA News.

Join Us at RemTEC '09:
Remediation Tech Summit
March 3-5, 2009
Marriott Atlanta Marquis
265 Peachtree Center Avenue
Atlanta, GA 30303

Join us at the Battelle Bioremediation Symposium:
Baltimore, MD
May 5-9, 2009
Come by and say hello!

ZEBRA On The Move:
Our Raleigh has moved
4205 Newington Hills Way
Cary, NC 27513
919-424-6122

ZEBRA VACMASTER 1000: ZEBRA Environmental has just added a VACMASTER 1000 to its fleet.

Read More About It